Shanghai Junxun Aviation Aircraft Jack: Assembly Process & Shipment


2026-09-19

Following our previous introduction to the Aircraft Jack and its assembly steps, we are pleased to share the assembly process through video, along with the latest s on product loading and shipment.

 

Assembly Process

 

This process ensures that each aircraft jack delivers reliable performance, precise control, and long-term durability in real-world maintenance environments.

Installation of jacks

Pre-operation Inspection

Before using the jack each time, a strict inspection must be conducted:

 

1.Check if the hydraulic oil in the tank is sufficient. The liquid level must reach 4/5 of the tank's height. If insufficient, add 10# or 15# aviation hydraulic oil.

 

2.Inspect if there are any damages on the surface of the hydraulic cylinder, and check if there are any leaks or drips in the hydraulic pipelines and pipe joints.

 

3.Check if the manual pump and pneumatic pump are working properly. Only after everything is normal can the operation be carried out.

 

Efficient Packaging and Shipment

In addition to the assembly process, we are also sharing s on the packing and shipment. Each aircraft jack is securely packaged to prevent damage during transportation, using reinforced materials and professional handling procedures.

 

GSE Tripod Jack Packed

 

Our logistics team ensures:

  • Safe and secure loading operations

  • Efficient coordination for timely delivery

  • Compliance with international shipping standards

The latest aircraft jack has now been successfully prepared and shipped, ready to support our customers’ aircraft maintenance operations worldwide.

 

Commitment to Quality and Reliability

From assembly to delivery, every step reflects our commitment to quality, safety, and customer satisfaction. By continuously improving our manufacturing and logistics processes, we aim to provide dependable ground support equipment for the aviation industry.

If you have interested in the product, just click the contact us to get more information and quote about the GSE, and note the part number:

JXHK-GB-1784  NOSE JACK 40T(Boeing 777-200/300 aircraft )

JXHK-GB-1786  MAIN / WING JACK  130T(Boeing 777-200/300 aircraft )

JXHK-GB-1788  SAFETY / TAIL JACK  55T(Boeing 777-200/300 aircraft )

If you need tripod jack for other airline series, we also provide them, like A320,A330,B737,B747,CRJ-9000, ssj100 etc.

 

Shanghai Junxun Aviation Technology Company always keep the idea that "Quality is Our Life", committed to providing professional products and excellent services to the global aviation industry.

As the global aviation industry continues to grow, Shanghai Junxun Aviation will persist in its commitment to innovation and quality, providing more international customers with high-quality products and services.